IMPLANTATION OF 5 MANDIBULAR IMPLANTS AND IMMEDIATE LOADING

Dr Jérôme Amsellem / Marseille, FRANCE
Post-graduate Implantology and Periodontology New York University.
Former consultant at the Faculty of Marseille

PRE-OPERATIVE RADIOGRAPHY

ENDOBUCCAL

Note the visible bone deformities through the gum

Preparation for implant placement

Placement of 5 MAER Implants
Securing of implant replicas screwed onto the transfers and clipped onto the plastic rings with luxabite
Aesthetic result the day after the surgery
Plaster model
Symmetrical arrangement of the 5 implants
Large volume of the bar to ensure its resistance
The healing 24 hours after the surgery around the pillars allows the fittings to be performed without bleeding.
REMOVAL OF HEALING SCREWS
BAR SCREWED IN MOUTH
PRECISION OF ADAPTATION OF THE BAR SCREWED IN THE MOUTH

Occlusion wax screwed in the mouth.

2 impression transfers are embedded in the PEI resin to be able to screw it in the mouth

The occlusion wax is mounted on a PEI made on the molding from the impression after the placement of the implants.

Checking the positioning of the occlusion wax

MOUNTING TEETH ON WAX ON OCCLUSER
PROSTHESIS SCREWED ON THE MOUTH ON THE SAME DAY
Fitting

RADIOGRAPHY CONTROL

(Visited 228 times, 1 visits today)